SAUDI ARABIA-MANIFA CENTRAL PROCESSING CORE HYD
CLIENT: SNAMPROGETTI-SAUDI ARAMCO
The project involved the integrated design of all new plant buildings. Specifically, structural and technical system designs were drafted for the following blast resistant buildings:
- SUBSTATION 004 – GOSP 1
- SUBSTATION 005 – GOSP 2
- SUBSTATION 006 – GOSP 3
- SUBSTATION 009 – COMPRESSION
- PIB 01
- PIB 02
- PIB 03
- PIB 05 – COMPRESSION
- SATELLITE MAINTENANCE BUILDING 02
- OPERATOR SHELTER – GOSP 1
- OPERATOR SHELTER/ LAB – GOSP 2
- OPERATOR SHELTER – GOSP 3
- OPERATOR SHELTER 05 - COMPRESSION
- PRAYER BUILDING
They were built in reinforced and prestressed concrete.
For the same project, integrated design for the following steel buildings was provided for the:
- CHEMICAL STORE
- SMOKING SHELTER – GOSP 1
- SMOKING SHELTER – GOSP 2
The whole project, which provided for the construction of about 9‘500 m² of buildings, was drafted in accordance with technical American codes (ACI, ASCE, AISC), international architectural and technical system codes (INTERNATIONAL BUILDING CODE) and Client specifications (ARAMCO STANDARDS).