Go to content

PORTFOLIO - work 6 - EsseTi Servizi Tecnici

Skip menu
Skip menu
SAUDI ARABIA-MANIFA CENTRAL PROCESSING CORE HYD
CLIENT: SNAMPROGETTI-SAUDI ARAMCO
The project involved the integrated design of all new plant buildings. Specifically, structural and technical system designs were drafted for the following blast resistant buildings:

  • SUBSTATION 004 – GOSP 1
  • SUBSTATION 005 – GOSP 2
  • SUBSTATION 006 – GOSP 3
  • SUBSTATION 009 – COMPRESSION
  • PIB 01
  • PIB 02
  • PIB 03
  • PIB 05 – COMPRESSION
  • SATELLITE MAINTENANCE BUILDING 02
  • OPERATOR SHELTER – GOSP 1
  • OPERATOR SHELTER/ LAB – GOSP 2
  • OPERATOR SHELTER – GOSP 3
  • OPERATOR SHELTER 05 - COMPRESSION
  • PRAYER BUILDING

They were built in reinforced and prestressed concrete.
For the same project, integrated design for the following steel buildings was provided for the:

  • CHEMICAL STORE
  • SMOKING SHELTER – GOSP 1
  • SMOKING SHELTER – GOSP 2

The whole project, which provided for the construction of about 9‘500 m² of buildings, was drafted in accordance  with technical American codes (ACI, ASCE, AISC), international architectural and technical system codes (INTERNATIONAL BUILDING CODE) and Client specifications (ARAMCO STANDARDS).
                                
EsseTi S.r.l.
P.IVA  06863730633
                                
Copyright © 2025.  EsseTi Servizi Tecnici  - All rights reserved.    
                                
Web Design: TLP

Web Design: TLP
Privacy Policy
Cookie Policy
Back to content